Found 577 Products For "tuv truck paint booth"
자연적으로 산업 흡입 공기 살포 부스 물 커튼 여과기 가구
Naturally intake air spray booth water curtain filter furniture industrail Dimension Inner dimension 15000×5000×5000 (L×W×H) External dimension 16896×5146×5800 (L×W×H) Main door Structure Manual folding aluminum alloy door with 4 leaves, inside and outside δ= 0.476mm color steel plate, 70mm thick, internal filling: EPS wallboard production, equipped with standard gate tempered glass observation window, size: 550 × 1150mm(W × H); Type Side entry and exit Quantity Door opening
BZB 스프레이 부스 페인트 예습 스테이션
Pre-Station Connection With Spray Booth For Garage Equipment BZB-6400 Specification for Preparation Room BZB-6400 1 Inside Size(mm) 6400×4000×2650 (L×W×H) 2 Outside Size(mm 7650×4106×3400 (L×W×H) 3 Total Power(KW) 6.5 Cabin System: 1. Roof air plenum construction: Cold rolling bending sprayed plate; Roof Panel: Galvanized steel, Installation type: steel rope hoisting. 2. Front and Two Sides: PVC soft curtain slipping on Aluminum guide. 3. Back wallboard: EPS steel skin panel,
고압 누설 점검 버스 수질 시험 부스
Bus Water Inspection Room Shower Room Water recircle High Pressure Leackage Inspection Quick Details: 1. Big water Inspection room for Bus 2. Working Pressure: 2.8Bar 3. Drive throught design to get better efficience. Product Application The water test room was used to test the water Sealing of the vehicle, By shed rain, the rain testing conditions is similar to their natural state phase, to confirm the Water seal status of the vehicle, implement leaky silicone waterproof to
방을 군 페인트 코팅 선에 굽는 철도 운반 탱크
Rail Way Transport Paint system for Industry Machine Customed Smart design Baking House Features: Widely working range, high speed and high accuracy. It is especially suitable for spraying Industrial parts such as metal, vehicle and others, and can be integrated with auxiliary devices such as turntable, slide conveyor chain system, etc. Maint Process: workpiece paint pre-treatment--cathodic electrodeposition primer coating-- PVC glue--weld seam sealing-- middle coating-
오븐 철 기판 15 분 세트 자동차 코팅 라인을 굽기
Baking Oven in car painting production line for sale cusotmied design Project in auto factory Product Application This is the whole line for SG Automotive Group Project,it including pre-treament,sanding,painting, baking in the production line.It offer high efficiency producing process to gurantee the production capacity require. Maint Process: workpiece paint pre-treatment--cathodic electrodeposition primer coating-- PVC glue--weld seam sealing-- middle coating--surface
판매 중 페인트를 칠하는 가입자 회로를 페인트를 칠하는 자동 분사한 기계 자동차
Automatic Spraying Machine Car Painting Line equipment painting on Sale Maint Process: workpiece paint pre-treatment--cathodic electrodeposition primer coating-- PVC glue--weld seam sealing-- middle coating--surface coating and drying-- check and repair process--and complete coating of paint material --products inspection work. Some necessary main Equipment for some main process: Systems Equipment Details Pre-treamment 1. Flood wash equipment 2. Degrease equipment 3.
생산 라인을 페인트를 칠하는 배설실 CE LPG 실린더 스프레이
Preparation Room for vehicle in Military Factory Machine Paint productin line equipments Some necessary main Equipment for some main process: Systems Equipment Details Pre-treamment 1. Flood wash equipment 2. Degrease equipment 3. Electrophoresis equipment 4. Electrophoresis equipment Chain conveyor system 1. Aluminium fixture block 2. Chain transit unit 3. Steel alloy track 4. Inverterters & gear motor Spray booth 1. Size:Customied 2. Fan exhaust system 3. Exhaust gas
차량을 위한 방을 미군에 굽는 고온에 의한 스프레이 도장 생산 라인
High Temperature Baking Room for vehicle in Military Factory Paint productin line equipments Maint Process: workpiece paint pre-treatment--cathodic electrodeposition primer coating-- PVC glue--weld seam sealing--middle coating--surface coating and drying-- check and repair process--and complete coating of paint material--products inspection work. Some necessary main Equipment for some main process: SystemsEquipment DetailsPre-treamment1. Flood wash equipment2. Degrease
공간 바람 블레이드 60 um 전기영동 공업용 도료 라인을 굽기
Baking Room in Wind Blade Painting Line Project in Handan Wind Blade Factory Paint Room Functional and structural requirements 1. Chamber body: use rock wool insulation board, and set up a folding movable partition wall at 43m in the length direction of No. 3 and 4 drying rooms. The material of the partition wall is the same as that of the side panels. 2. Gate: Set up sliding-board industrial lift gates at both ends, without thresholds at the bottom of the gate. 3. The layout