Found 39 Products For "movable spray booth for car"
플랫폼으로 일하는 도색실 상승을 위한 움직일 수 있는 일한 플랫폼
Hanging Style 3D Lift for Bus Paint Booth Lifting Working Platform for Paint Line Quick Detail: 1. Painting Room with hanging Lifting working platform 2. Can be drive throught design 3. With Man lift inside to be convirionient to worker do the painting job 4. Side desgin according custome's requrie Specificaiton for Bus Big spray booth. No. Item Unit Value Remark 1 Equipment type One-way entry 2 Air-inlet type Up air-inlet Below air-return 3 Mist treatment Dry fiber glass
전기 회전 문과 굽기 부스를 페인트를 칠하는 방 큰 바람 블레이드를 말리는 페인트
Electric Rolling Door for Drying Room in Big Wind Blade Painting Line Project Functional and structural requirements 1. Chamber body: use rock wool insulation board, and set up a folding movable partition wall at 43m in the length direction of No. 3 and 4 drying rooms. The material of the partition wall is the same as that of the side panels. 2. Gate: Set up sliding-board industrial lift gates at both ends, without thresholds at the bottom of the gate. 3. The layout of the
4s 판매점을 위한 주문 제작된 자동차 도료 라인 박판 금속 라인
Sheet Metal Paint Line for 4s Shop Spray Booth Line High Efficiency Factory Direct Sale Product Application We are professional to produce metal sheet painting line for 4S shop.Have cooperated with 48 main car 4 S shop in China.The system can bring the very high efficiency for the 4S car repair shop. The pattern of Sheet metal paint line With return track. Cars can movable left to right or right to left. Equipped 48 sets trolley with brake function. Every Sheet Metal Paint
자동차 4S를 위한 자동차 박판 금속 도료 라인 빠른 수리 페인트 시스템은 쇼핑합니다
Auto Sheet Metal Paint Line Fast Repair Paint System For Car 4S Shop Product Application We are professional to produce metal sheet painting line for 4S shop.Have cooperated with 48 main car 4 S shop in China.The system can bring the very high efficiency for the 4S car repair shop. The pattern of Sheet metal paint line With return track. Cars can movable left to right or right to left. Equipped 48 sets trolley with brake function. Every Sheet Metal Paint Line equipment bottom
4s 샵을 위한 CE 표준 주문 제작된 몸체 수리 차 시트 금속선
Asia Biggest Metal Sheet Painting Line Most Professional Body Repair Line CE standard Product Application We are the first manufacturer to design the metal sheet painting line.It can high full fill the high efficiency requirefor different kind 4S repair shop. The pattern of Sheet metal paint line With return track. Cars can movable left to right or right to left. Equipped 48 sets trolley with brake function.Every Sheet Metal Paint Line equipment bottom has 6 rows track
10 um 공업용 도료 라인 안에 있는 바람 블레이드 리프트
Customied Spray Booth With Lift inside Wind BladePaint Booth CE Standard Spray Room Product Application This follow machine is used in Some Industry workpiece painting and baking system.Full fill CE standard. Our Jingzhongjing Group can produce different kind of painting lines equipment according customer's Requirement. Functional and structural requirements 1. Chamber body: use rock wool insulation board, and set up a folding movable partition wall at 43m in the length
암면 PU 2.5m 분 디젤 엔진 공업용 도료 라인
Wind Blade Painting Line Project Hot Sale Diesel Truck spray booth Factory direct Sale Functional and structural requirements 1. Chamber body: use rock wool insulation board, and set up a folding movable partition wall at 43m in the length direction of No. 3 and 4 drying rooms. The material of the partition wall is the same as that of the side panels. 2. Gate: Set up sliding-board industrial lift gates at both ends, without thresholds at the bottom of the gate. 3. The layout
인테르넬 원 건조 룸 20 마이크론 공업용 도료 선
Internel circle Drying Room in Big Wind Blade Painting Line Project On Sale This is Customer-made Industry Spray Booth base on customer's require.Workshop space. Produce Capacity.Contact us if you have require.we can design to full fill your require. The Follow project is for Wind Blade Painting Line Project Functional and structural requirements 1. Chamber body: use rock wool insulation board, and set up a folding movable partition wall at 43m in the length direction of No.
공간 바람 블레이드 60 um 전기영동 공업용 도료 라인을 굽기
Baking Room in Wind Blade Painting Line Project in Handan Wind Blade Factory Paint Room Functional and structural requirements 1. Chamber body: use rock wool insulation board, and set up a folding movable partition wall at 43m in the length direction of No. 3 and 4 drying rooms. The material of the partition wall is the same as that of the side panels. 2. Gate: Set up sliding-board industrial lift gates at both ends, without thresholds at the bottom of the gate. 3. The layout