logo

Found 460 Products For "customized bus spray booth"

품질 공간은 버스  자동차를 위해 42KW 샤워 시험 라인을 훈련시킵니다 공장

공간은 버스 자동차를 위해 42KW 샤워 시험 라인을 훈련시킵니다

Train Shower Room Customied Shower Test Line for Buses and Cars Top Rank Supplier The Description about Technical Parameters for Water Test Booth Item Technical Parameters External dimention 15550×8400×5800mm(L×W×H) Internal dimention 15000×5500×5000mm(L×W×H) Room body Square steel structure Side wall 70mm thickness EPSpanel(0.5mm thickness color steel) Rool panel 50mm thickness EPSpanel(0.5mm thickness color steel) Door struction 70mmEPS sandwich wall panel,Alv rim,4 pcs

품질 오븐 체인 교통 10 um 도료 라인 시스템을 1회분으로 처리하세요 공장

오븐 체인 교통 10 um 도료 라인 시스템을 1회분으로 처리하세요

Chain Transport system for Big Steel Paint Production Line in Huizhou Ccmsa Project Main Brand: Baozhongbao(BZB) Jingzhongjing(JZJ) Two Produce Base: 1) Guangdong Jingzhongjing Industrial Painting Equipment Co., Ltd(In Guangzhou, Since 1999), which Cover 30, 000 M2, with 218 staff, Main Product: Spray booth and preparation room for Auto/Bus/Truck/Boat/Aircraft and all different industry, Auto sheet-metal line, Water Test line. Power coating line, focus on the producing for

품질 손수레와 강철 프로파일 도료 라인 로봇 페인트 생산 라인 트랜스포트 공장

손수레와 강철 프로파일 도료 라인 로봇 페인트 생산 라인 트랜스포트

Steel Profile Paint Line Robot Paint Production Line Transport With Trolley Main Brand: Baozhongbao(BZB) Jingzhongjing(JZJ) Two Produce Base: 1) Guangdong Jingzhongjing Industrial Painting Equipment Co., Ltd(In Guangzhou, Since 1999), which Cover 30, 000 M2, with 218 staff, Main Product: Spray booth and preparation room for Auto/Bus/Truck/Boat/Aircraft and all different industry, Auto sheet-metal line, Water Test line. Power coating line, focus on the producing for oversea

품질 인테르넬 원 건조 룸 20 마이크론 공업용 도료 선 공장

인테르넬 원 건조 룸 20 마이크론 공업용 도료 선

Internel circle Drying Room in Big Wind Blade Painting Line Project On Sale This is Customer-made Industry Spray Booth base on customer's require.Workshop space. Produce Capacity.Contact us if you have require.we can design to full fill your require. The Follow project is for Wind Blade Painting Line Project Functional and structural requirements 1. Chamber body: use rock wool insulation board, and set up a folding movable partition wall at 43m in the length direction of No.

품질 그림 방 베이크 부스 워터 커튼을 분사기로 닦는 생산 라인을 페인트를 칠하기 공장

그림 방 베이크 부스 워터 커튼을 분사기로 닦는 생산 라인을 페인트를 칠하기

Painting Production Line Sandblasting Painting Room Bake Booth Water Curtain Product Application This is the painting Production line use in some Industrial equipments,do the cusotmied design according workshop space,producing capacity require and paint process detail requirement. Maint Process 1 Pretreatment: Dipping pretreatment with overhead crane, or fully automatic spraying pretreatment 2 Conveying system: light closed-circuit conveyor, power and free conveyor, overhead

품질 방을 군 페인트 코팅 선에 굽는 철도 운반 탱크 공장

방을 군 페인트 코팅 선에 굽는 철도 운반 탱크

Rail Way Transport Paint system for Industry Machine Customed Smart design Baking House Features: Widely working range, high speed and high accuracy. It is especially suitable for spraying Industrial parts such as metal, vehicle and others, and can be integrated with auxiliary devices such as turntable, slide conveyor chain system, etc. Maint Process: workpiece paint pre-treatment--cathodic electrodeposition primer coating-- PVC glue--weld seam sealing-- middle coating-

품질 연결 부스 로봇 전기 영동 도장 생산 라인 공장

연결 부스 로봇 전기 영동 도장 생산 라인

Connection Booth for Wind Blade Painting Production Line Equipments Turnkey Project Maint Process 1 Pretreatment: Dipping pretreatment with overhead crane, or fully automatic spraying pretreatment 2 Conveying system: light closed-circuit conveyor, power and free conveyor, overhead open conveyor, and so on 3 Oven: batch oven, hot air circulating drying oven, tunnel oven, bridge drying oven 4 Spray paint room type :Water spray paint room; Water spray paint room; Dry spray paint

품질 급한 치료 자동차 페인팅 룸 물 기반 페인트 건조 부스 공장

급한 치료 자동차 페인팅 룸 물 기반 페인트 건조 부스

Water-Based Paint Drying Booth Rapid-cure Car Painting Room Quick Details: *Specifically designed for water-based paint, this new solution uses customized high-speed adjustable stainless steel air nozzles to increase the air speed by 4 times compared to traditional ventilation systems. *Shorten the leveling time and drying time after spraying. *Accelerate the evaporation of solvent (before starting the drying cycle process). Maint Features: Widely use for Rapid-cure Paint

품질 공간 바람 블레이드 60 um 전기영동 공업용 도료 라인을 굽기 공장

공간 바람 블레이드 60 um 전기영동 공업용 도료 라인을 굽기

Baking Room in Wind Blade Painting Line Project in Handan Wind Blade Factory Paint Room Functional and structural requirements 1. Chamber body: use rock wool insulation board, and set up a folding movable partition wall at 43m in the length direction of No. 3 and 4 drying rooms. The material of the partition wall is the same as that of the side panels. 2. Gate: Set up sliding-board industrial lift gates at both ends, without thresholds at the bottom of the gate. 3. The layout