Found 579 Products For "ce tuv painting spray booth"
버스와 트럭을 위한 버스 수질 시험 부스를 위한 샤워 실험실
Shower Test Booth Station Shower Test Line for Buses and Cars/Truck Top Rank Supplier Product Application The water test room was used to test the water Sealing of the vehicle, By shed rain, the rain testing conditions is similar to their natural state phase, to confirm the Water seal status of the vehicle, implement leaky silicone waterproof to the part that may leak water. The Description about Technical Parameters for Water Test Booth Item Technical Parameters External
라틴 천 봉합 BZB 열차 수질 시험 부스
Shower Testing Booth New 2020 Ratin Sealing Test Production Line for Train Reasonable layout is a must during the design process. The logistics must be smooth. Moreover, we focus on the energy saving measures of our equipment, and the energy is rationally used. We carry out the national policies and regulations in relation to such aspects as environmental protection, as well as the safety and hygiene of labor. The whole project reaches both "three wastes" emission standard
36.5KW 비가 오는 테스트 부스
Raining testing Room Shower Testing Booth Water Test Line for Car Factory Product Application This kind of equipment is use for testing the leakage of the vehicle during big raining or storm. We can make different water test room according customer's vehicel require. The Description about Technical Parameters for Water Test Booth Item Technical Parameters External dimension 7006×6800×3600mm(L×W×H) Internal dimension 6900×3300×2800mm(L×W×H) Room body Square steel structure
산업적 오토 카 비 누출 샤워 시험 부스
Shower Testing System Auto Shower Testing Booth Industrial Shower Testing Booth for Testing Rain Leakage in Cars Product Application This kind of equipment is use for testing the leakage of the vehicle during big raining or storm. We can make different water test room according customer's vehicel require. The Description about Technical Parameters for Water Test Booth Item Technical Parameters External dimension 7006×6800×3600mm(L×W×H) Internal dimension 6900×3300×2800mm(L×W
오토 카는 36.5KW 쇄도 실험실 / 테스트 부스를 씻습니다
Shower Test Shower Testing System Auto Shower Testing Booth Car Wash Booth Bzb Brand New We insist on the principle of making an advanced, reliable, economical and practical automotive rain testing room. In addition, we take the characteristic of our product into adequate consideration, and actively put to use the state-of-the-art technique and equipment. The ability of testing the water tightness of workpieces is greatly improved, which allows the index to meet the
방을 군 페인트 코팅 선에 굽는 철도 운반 탱크
Rail Way Transport Paint system for Industry Machine Customed Smart design Baking House Features: Widely working range, high speed and high accuracy. It is especially suitable for spraying Industrial parts such as metal, vehicle and others, and can be integrated with auxiliary devices such as turntable, slide conveyor chain system, etc. Maint Process: workpiece paint pre-treatment--cathodic electrodeposition primer coating-- PVC glue--weld seam sealing-- middle coating-
부스를 굽기 위한 생산 라인을 코팅하는 왕복 기관 완전 자동 파우더
Hot Sale Power Coating line in Africa Project 2010 Adjustable Temperure for baking Booth Powder coat finishing is being used to provide high quality, durable paint finishes for a wider range of products and material types than ever before. Although the powder coating paint finishing process was originally developed to paint metal items, today it can be applied to plastics, glass, wood and medium density fibreboard (MDF). we have several conveyor types that have provided
차량을 위한 방을 미군에 굽는 고온에 의한 스프레이 도장 생산 라인
High Temperature Baking Room for vehicle in Military Factory Paint productin line equipments Maint Process: workpiece paint pre-treatment--cathodic electrodeposition primer coating-- PVC glue--weld seam sealing--middle coating--surface coating and drying-- check and repair process--and complete coating of paint material--products inspection work. Some necessary main Equipment for some main process: SystemsEquipment DetailsPre-treamment1. Flood wash equipment2. Degrease
공간 바람 블레이드 60 um 전기영동 공업용 도료 라인을 굽기
Baking Room in Wind Blade Painting Line Project in Handan Wind Blade Factory Paint Room Functional and structural requirements 1. Chamber body: use rock wool insulation board, and set up a folding movable partition wall at 43m in the length direction of No. 3 and 4 drying rooms. The material of the partition wall is the same as that of the side panels. 2. Gate: Set up sliding-board industrial lift gates at both ends, without thresholds at the bottom of the gate. 3. The layout