logo

Found 70 Products For "60um industrial paint lines"

품질 Dig 땅 디젤 화물 자동차 컨테이너 베이킹용 60 um 공업용 도료 라인 공장

Dig 땅 디젤 화물 자동차 컨테이너 베이킹용 60 um 공업용 도료 라인

Container Spray/Baking Booth Dig The Ground Design Hot Sale Diesel Truck spray booth This is Customer-made Industry Spray Booth base on customer's require.Workshop space. Produce Capacity.Contact us if you have require.we can design to full fill your require. The Follow project is for Yangzhou Big Painting Line Project Some necessary main Equipment for some main process: Systems Equipment Details Pre-treamment 1. Flood wash equipment 2. Degrease equipment 3. Electrophoresis

품질 Wind Blade Painting 60um Large Industrial Paint Lines 공장

Wind Blade Painting 60um Large Industrial Paint Lines

Wind Blade Painting Booth Customied Industry Big Spray Booth Product Application This paint booth for sale is very popular. It has diesel heating system. You can also choose infrared lamp heating system,natural gas heating system or LPG gas heating system. This equipment is used for the painting system for Wind Blade,and we can accept different kind of customied Design. Maint Process: workpiece paint pre-treatment--cathodic electrodeposition primer coating-- PVC glue--weld

품질 공간 바람 블레이드 60 um 전기영동 공업용 도료 라인을 굽기 공장

공간 바람 블레이드 60 um 전기영동 공업용 도료 라인을 굽기

Baking Room in Wind Blade Painting Line Project in Handan Wind Blade Factory Paint Room Functional and structural requirements 1. Chamber body: use rock wool insulation board, and set up a folding movable partition wall at 43m in the length direction of No. 3 and 4 drying rooms. The material of the partition wall is the same as that of the side panels. 2. Gate: Set up sliding-board industrial lift gates at both ends, without thresholds at the bottom of the gate. 3. The layout

품질 CE TUV 공업용 도료 라인을 코팅하는 두배 스프레이 공장

CE TUV 공업용 도료 라인을 코팅하는 두배 스프레이

Double Spray Paint Room PLC control system Top manufactuer in China CE standard Main Brand: Baozhongbao(BZB) Jingzhongjing(JZJ) Two Produce Base: 1) Guangdong Jingzhongjing Industrial Painting Equipment Co., Ltd(In Guangzhou, Since 1999), which Cover 30, 000 M2, with 218 staff, Main Product: Spray booth and preparation room for Auto/Bus/Truck/Boat/Aircraft and all different industry, Auto sheet-metal line, Water Test line. Power coating line, focus on the producing for

품질 두배 페인트 CE TUV 2.5m 분 공업용 도료 라인 공장

두배 페인트 CE TUV 2.5m 분 공업용 도료 라인

Double Paint Spray Room Customied Industry Painting Booth Factory Direct Sale Some necessary main Equipment for some main process: Systems Equipment Details Pre-treamment 1. Flood wash equipment 2. Degrease equipment 3. Electrophoresis equipment 4. Electrophoresis equipment Chain conveyor system 1. Aluminium fixture block 2. Chain transit unit 3. Steel alloy track 4. Inverterters & gear motor Spray booth 1. Size:Customied 2. Fan exhaust system 3. Exhaust gas treatment system

품질 Automatic Liquid  2.5m Min 60 Micron Industrial Paint Lines 공장

Automatic Liquid 2.5m Min 60 Micron Industrial Paint Lines

Industry Production Automatic Liquid Paint Spraying Booth Use New Technology Maint Process: workpiece paint pre-treatment--cathodic electrodeposition primer coating-- PVC glue--weld seam sealing-- middle coating--surface coating and drying-- check and repair process--and complete coating of paint material --products inspection work. Some necessary main Equipment for some main process: Systems Equipment Details Pre-treamment 1. Flood wash equipment 2. Degrease equipment 3.

품질 큰 바람 블레이드가 2.5m 분 BZB 공업용 도료 라인을 굽습니다 공장

큰 바람 블레이드가 2.5m 분 BZB 공업용 도료 라인을 굽습니다

Ce Approved Big Wind Blade Paint Spray Booth Big Baking Booth Product Application This equipment is used for the painting system for Wind Blade,and we can accept different kind of customied Design. Maint Process: workpiece paint pre-treatment--cathodic electrodeposition primer coating-- PVC glue--weld seam sealing--middle coating--surface coating and drying-- check and repair process--and complete coating of paint material--products inspection work. Some necessary main

품질 승강기 큰 장비는 트럭 2.5m 분 공업용 도료 선을 버스로 나릅니다 공장

승강기 큰 장비는 트럭 2.5m 분 공업용 도료 선을 버스로 나릅니다

Man Lift for Bus Spray Booth Truck Paint Booth Customied Design Big painting equipments Maint Process: workpiece paint pre-treatment--cathodic electrodeposition primer coating-- PVC glue--weld seam sealing-- middle coating--surface coating and drying-- check and repair process--and complete coating of paint material --products inspection work. Some necessary main Equipment for some main process: Systems Equipment Details Pre-treamment 1. Flood wash equipment 2. Degrease

품질 암면 PU 2.5m 분 디젤 엔진 공업용 도료 라인 공장

암면 PU 2.5m 분 디젤 엔진 공업용 도료 라인

Wind Blade Painting Line Project Hot Sale Diesel Truck spray booth Factory direct Sale Functional and structural requirements 1. Chamber body: use rock wool insulation board, and set up a folding movable partition wall at 43m in the length direction of No. 3 and 4 drying rooms. The material of the partition wall is the same as that of the side panels. 2. Gate: Set up sliding-board industrial lift gates at both ends, without thresholds at the bottom of the gate. 3. The layout

1 2 3 4 5